丰满岳乱妇在线观看中字无码,黑人巨摘花第一次出血,特级毛片a级毛片免费观看网站,人人爱天天做夜夜爽2020

 
         
    Home Contact us 中文版
Home About us News Products Honors Feedback Contact us  
     Wellhead
     X-mas Tree
     valve
     Tube remit
     bop
     Casting products
     reducer
     Safety valve
 
 
 
YANCHENG SHENHUA MACHINERY MANUFACTURE CO.,LTD
Add:No. 1299, Jianhu Avenue South Road, Jianhu County
Tel:+86-515-86500588
    86500699
Fax:+86-515-86500599
    86500699
zip:224761
Email:zxw@ycshenhua.com
You are the location  >> Shenghua Machinaty manufacture Co.,Ltd >> Product    
 
   
  ZJGH100 Detailed parameter  
  ZJG100/35  drilling  fluid  manifold  consists  of  Z23Y100-5000PSl  &  Z23Y50-5000PSmnd  valve , high-pressure  spherical  union ,  high-pressure  cone  union , tee . High-pressure  hose . elbow . Pressure  gauge . And  pup  joint etc .
  Ground  valve - group  adopts  goose  type  tee  with  compact  structure . Little  fluid  resistance  and  large  power  effectuality .
  Adaptor  spool  adopted  on  rigid  valve-group  can  be  directly  used  as  single  pipe  on  site .
  create  quick  strip . As  for  being  manufactured  with  special  machining  tool , it  can  create  seal  under  fine  sphere  and  core  matched  with  sealing  ring .
The  gate  and  valve  seat  of  Z23Y-5000psi  mndvalve  are  welded  with  carbide  against  erosion  and  corrosion , so  that  it  can  enlarge  the  working  life . And  reduce  operating  torque .
        Elbow ,  adaptor ,  tee  and  cross  are  made  of  high-strength  alloy  steel , with  suited  wall  thick  and  fine  heat  treatment , so  it  can  meet  the  requirement  on  strength  and  corrosion .
        The  heat  treatment , so  it  can  meet  the  requirement  on  strength  and  corrosion .
        The  part  required  at  high  precision . Should  be  machined  with special  technique  to  ensure  the  manufacture  quality , and  the  pressed  part  should  be  hydrostatic  tested  on  strength  and  sealing  property  to  ensure  the  ex-plant  quality .
Installation
1 .  First  clean  up  each  sealing  face  and sealing  groove  of  union  and  coat  it  with  grease  and  rid  of  dirt  form  the pipeline .
2. Check  whether  up  each  jointer  is  fastened  or  not .
Usage  gist  & maintenance   
1.  Regularly  inject  mud gate  valve  with  grease  to  maintain  the  gate  valve ;
2.  Regularly  check  whether  all  connecting  posit on  and  fixing  bolts  are  loose ;
3.  If  leak  around  sealing  position , the  seal  should  be  replaced  immediately ;
4.  Keep  the  outer  surface  of  the manifold  clean  and  paint  it  against  rust  regularly .
Notice       
Z23Y-5000PSI hard  sealing  mud  gate  valve is only used  for  pipeline  opening/closing  but  for  choke  valve  so  as  avoid  damage  against  sealing  face .

 
 
Home | About us | News | Products | Honors | Feedback | Contact us 
COPYRIGHT[C]2011 YANCHENG SHENHUA    ALL RIGHTS RESERVES
亚洲AV一二三区成人影片| 嘿咻嘿咻男女免费专区| 亚洲AV无码成H人动漫无遮挡| 成年网站未满十八禁| 果冻传媒一二三区艾秋游戏| 中文字幕人妻丝袜二区| 中日AV乱码一区二区三区乱码| 丰满妇女毛茸茸刮毛| 极品老师腿张开粉嫩小泬| 欧美老熟妇牲交| 全免费a级毛片免费看网站| 免费人妻无码不卡中文字幕系列| 无码人妻熟妇AV又粗又大| 亚洲中文字幕无码一区日日添| 97精品久久久久中文字幕| 在线精品无码字幕无码av| 日本一区二区在线播放 | 青草伊人久久综在合线亚洲观看| 精品欧洲AV无码一区二区14| 成熟人妻av无码专区| 色婷婷综合和线在线| 97国产精华最好的产品价格| 国产精品毛片无遮挡| 亚洲AV无码国产精品色午夜| 人人妻人人澡人人爽欧美一区| 午夜无码一区二区三区在线观看| 狂野欧美性猛交xxxx| 久久精品国产亚洲大片| 亚洲AV成人无码精品综合网站 | 久久综合精品国产二区无码| 欧美大香线蕉线伊人久久| 久久精品人人槡人妻人人玩| 玩弄人妻少妇500系列网址| 永久免费毛片在线播放| 在线精品一区二区三区| 日本牲交大片无遮挡| 在线视频观看免费视频18| 亚洲熟妇av一区二区三区| 无码精品日韩中文字幕| 一本色道久久综合狠狠躁| 日本熟妇人妻xxxxx视频|